Furniture sourcing in China for FF&E contractors
You hold the FF&E schedule and the programme. We price it line by line, split it across the factories that make each part, inspect the goods when production is finished, and load full containers for your site.
One company between your schedule and your site
A furniture package for an FF&E contractor starts with a controlled schedule: what each item is, where it belongs, how many are required, and who approves its specification. FBM Furniture, the furniture sourcing line of FBM Sourcing Limited, helps coordinate that package in China. You retain the project decisions; we connect the accepted furniture brief to sourcing, drawings, approvals, one inspection after bulk production and full-container loading.
FBM Sourcing manages the entire China procurement package for overseas construction projects. Our main markets are North America and Australia. As your furniture sourcing partner, we work from your company’s project schedule rather than asking you to buy a fixed collection. This page sets out how the contractor’s drawings, client approvals and receiving plan should connect to the furniture order.
One company between your schedule and your site
Furniture manufacturing is specialised. Seating, upholstery, casegoods, metal frames and fixed joinery can require different production lines. An FF&E package should keep those lines connected through the same item codes, revisions and finish references. One generic description such as “hotel furniture” is insufficient to tell each production line what to make.
We source the furniture against your schedule and coordinate the package through FBM Sourcing. The quotation should identify the proposed construction and flag substitutions against your specification. A reference photo may communicate an appearance, but dimensions, materials, finishes and interfaces still need to be defined before that reference becomes a production instruction.
For a contractor, the practical starting point is a dated schedule with one stable code per item. Keep the room or area, quantity, dimensions, drawing reference, material, upholstery and finish attached to that code. If the same chair appears in several rooms, record whether it is identical everywhere or belongs to separate finish variants.
Set the approval responsibilities around the programme
Name the person or company that accepts dimensions, finishes, materials and any proposed alternative. A contractor may coordinate the order while a client or project consultant retains final approval. Record those roles before issuing the furniture brief. Otherwise, an email accepting a colour can be mistaken for approval of the complete product.
Divide the schedule into items that can follow an accepted specification and items that still need decisions. Custom pieces require drawings and material details; an existing design may still need a selected fabric, colour, quantity or project-specific evidence. Mark pending decisions directly beside the affected item instead of treating the whole package as equally ready.
Define what an approval covers. A finish chip can establish colour and sheen on a stated substrate. A drawing can establish dimensions and connections. A complete sample can answer questions about the assembled form. None should silently stand in for the others. Use the same accepted references in the production instructions and inspection record.
Use drawings and samples to fix the furniture reference
For custom products, shop drawings and the material list go back and forth until you sign them off. Identify the current revision and retain the accepted version. Comments should refer to the item code and the precise detail being changed, such as an edge profile, exposed joint, fabric direction or fixing position.
Where samples are required, record which sample is being reviewed and why. The finish, fabric and complete product may have separate approval decisions. Keep photographs linked to a sample label and drawing revision so a reviewer can tell what was accepted. A message saying “looks good” without an item or revision is a weak production reference.
If a change is requested after approval, identify the affected items and ask for its effect to be reviewed before it replaces the accepted specification. A revised fabric, dimension or fitting should appear in the schedule and drawing record. The contractor should then confirm whether related items or room layouts need to change as well.
Bring the project requirements into the brief
Tell us where the furniture will be used and supply the relevant project specification. Your specifier or certifier decides which requirements apply to your project. We confirm what the factory holds before we quote. The evidence request should identify the proposed product or material assembly, rather than rely on a broad description of the factory.
Treat unresolved requirements as open decisions. State the person responsible for closing them and the item codes affected. If a quoted alternative changes the materials or construction, have the project team review whether the original evidence still applies. A commercial description such as “contract grade” should never replace the actual project requirement.
Our compliance page provides a starting point for organising questions by destination. It is useful alongside the project specification, rather than as a substitute for a project-specific applicability decision. North American and Australian orders should each carry their own destination and use details in the brief.
Two ways to work with FBM Sourcing
For suppliers you nominate, we charge a 5% commission; for products we source for you, we quote a direct price. Decide which arrangement applies to the relevant items so the order responsibilities are understood. The custom or non-custom design choice does not by itself decide which of these arrangements applies.
All quotations, invoices and shipping documents are issued by FBM Sourcing. You coordinate the order with us. Read our FAQ for the scope of each arrangement, including the distinction between products we source and orders managed with suppliers you nominate. Sea freight is quoted to you before shipment.
One inspection after bulk production and before shipment
Our FBM Sourcing QC team performs one inspection after bulk production is complete and before shipment. The accepted specification, drawings, sample references and quantities provide the inspection reference. We document the goods with photos and video. Your own project team is welcome to attend the inspection with us.
The contractor should make the accepted reference set easy to identify. A current schedule and a folder of outdated drawings can contradict one another; settle that conflict before the goods are evaluated. If quantities or approved finishes vary by room, keep those variants visible in the reference set rather than relying on memory.
Plan full containers around the receiving team
Our project packages ship in full containers. Product groups from the same project can be consolidated into full containers. Tell us whether your site team needs assembled or flat-pack furniture, what its assembly responsibility is, and how cartons should be identified for receiving and distribution.
Use item codes, room or area references, and a clear distinction between furniture and associated components in the packing brief. The receiving team should be able to connect the packing information to the FF&E schedule. Confirm how hardware packs and loose cushions will be identified, especially when they travel separately from the main furniture piece.
A loading plan describes the goods in the container; the contractor’s installation plan describes what happens on site. Keep those documents connected while recording site access, assembly and installation responsibilities separately. This lets the project team review the actual package without assuming that loading order settles every installation dependency.
Send the package that supports a comparable quotation
Send your company name, project location, room or area schedule, quantities, drawings for custom pieces, reference images, materials, fabrics and finishes. Identify what is already accepted, what remains pending and whether your team supplies fabric. Include the project’s evidence requirements and the receiving or assembly brief.
Use our FF&E schedule-to-quotation checklist to structure those inputs. For approval records, see samples, finishes and approvals. If your construction project includes building materials as well as furniture, use FBM Sourcing’s broader project procurement page to explain the combined requirement.
We work with companies: Developers · General Contractors · Builders · Commercial Project Owners · Interior Design & Construction Companies · FF&E Solution Providers. Our main markets are North America and Australia.
Sometimes, on a large project, the furniture alone fill full containers; sometimes the furniture share containers with the other product categories of the same project; and sometimes, in one batch, we combine a dozen or more product categories from several projects of the same client into a few containers — always full containers, and for us this is routine, well-practised work.
For item-level approval decisions, see custom and existing-design commercial furniture orders.
Four things we set up around your programme
Pricing the schedule, fixing the specification before production, checking compliance before we quote, and bringing several factories back together into one loading.
01
01 · Your FF&E schedule, priced line by line
You send the schedule room by room with quantities, plus drawings for the custom pieces. We collect quotations from the factories that run the production line for each product, compare them, and quote you per line — like-for-like against your specification.
- Per line: item, specification, materials, fabric and finish, dimensions, unit price, quantity, packing and lead time
- Like-for-like against your spec, any substitution flagged
- Loose furniture and fixed joinery in one quotation, from the factories that make each part
- One product group priced first as a reference, if that suits your programme
Start with one product group. Where your project fits our service, we can price one product group first as a reference; if quality and price fit, we continue with the rest. Send us your current quote for a few items and we will price the same spec line by line.
02
02 · Samples, shop drawings and finishes signed off before production
A furniture package is fixed at sample and drawing stage, not at order stage. For custom pieces the factory prepares shop drawings and a detailed material list, and nothing goes into production until you have signed them off.
- Samples couriered to you for approval before production
- Fabric and finish swatches couriered with them
- Shop drawings and a material list for every custom piece, revised until you sign off
- Selections walked through on video calls if you cannot travel
The approved sample and the signed-off drawings are the reference for bulk production and for the inspection before shipment.
03
03 · Compliance checked before we quote
Our main markets are North America and Australia, where contract furniture is specified against local standards, so the first step in choosing a factory is checking that it holds the test reports or certifications for that specific product — confirmed before we quote.
- Office seating, North America — ANSI/BIFMA X5.1: we ask the factory for the test report of the specific model
- Office seating, Australia and New Zealand — AS/NZS 4438 for height-adjustable swivel chairs, certified by AFRDI: the certificate for the specific model
- Upholstered furniture, California — Technical Bulletin 117-2013, the requirements and test procedure for the smolder resistance of the materials used in upholstered furniture
- Composite wood, United States — TSCA Title VI compliant and labelled; 40 CFR 770.45(c) requires fabricators to label every finished good, or every box or bundle of finished goods
These are examples, not a complete list. Requirements differ by product, building type and jurisdiction, and your specifier or certifier decides what applies to your project. Tell us where your project is and what your specification calls for, and we confirm what the factory holds before we quote.
04
04 · One inspection, one consolidation, one loading window
Furniture for one project comes from several factories, and it has to reach your site as one delivery rather than five. We inspect at the factory when production is finished, consolidate into full containers, and send a loading report so your site team can unload in the order it installs.
- Our own QC team checks quantities, dimensions, finish, fabric and foam, hardware and packing against the signed-off specification
- A QC report with photos and video; your own project team is welcome to attend the inspection with us
- Goods from several factories consolidated into full containers before loading
- Cartons labelled as your site team asks, and a loading report with every shipment
If any products fail to meet the agreed standards, they go back for rework and re-inspection until all goods pass.
From your FF&E schedule to loaded containers
01
Your schedule, quoted line by line
You send your FF&E schedule or product list, room by room, with quantities and drawings for any custom pieces, and tell us where the project is. We collect quotations from the factories that run the production line for each product, compare them on price, capability and experience, and quote you per line — like-for-like against your spec, any substitution flagged.
02
Samples and sign-off
For large orders, samples are couriered to you for approval before production, together with fabric and finish swatches. Revisions go back to the factory until the sample matches your specification, and the approved sample becomes the production reference.
03
Proforma invoice and deposit
Once your selection is final we issue a proforma invoice with full product details, prices, deposit, warranty period, Incoterm and estimated dates. You pay the deposit stated on it only to the company account named on the PI — never to an individual, never to a factory. We do not change bank details by e-mail; if you receive such a message, video-call us before sending anything.
04
Shop drawings and finishes
For custom products the factory prepares shop drawings and a detailed material list, going back and forth with you until you sign off drawings, fabrics and finishes. Nothing goes into production until you have signed them off.
05
One inspection before shipment
When production is finished and before shipment, our own QC team checks quantities, dimensions, finish, fabric and foam, hardware and packing against the signed-off specification, and you receive a QC report with photos and video. Anything below standard is reworked, then re-inspected before shipment. Your own project team is welcome to attend the inspection with us.
06
Consolidation, loading and documents
After the balance is paid we consolidate the goods from the different factories, load full containers and send a loading report so unloading is easy. We arrange sea freight and documents, normally with our own forwarder; if you nominate a forwarder, we book with it. All quotations, invoices and shipping documents are issued by FBM Sourcing.
We source the package, or we manage the suppliers you nominate
Products we source. We find the factory that runs the production line for your product and quote a direct price. Sourcing, drawings, quality control, consolidation, loading and after-sales are all inside that price, and sea freight is quoted to you before shipment. All communication runs through us; factory names, contacts and quotations stay with us.
Suppliers you nominate. You keep the supplier — including products you select and price yourself at a showroom or market with us — and we manage the order for a 5% commission: specification and PI check, drawing coordination, production follow-up, quality control, consolidation into full containers, loading and export documents. After-sales is not included: claims fall under the supplier’s own warranty, and we can help you coordinate.
Both ways, all quotations, invoices and shipping documents are issued by FBM Sourcing, and you pay only the company account named on the PI. What each way covers, and what we charge for it, is set out in full on our FAQ page.
Questions FF&E contractors ask
Do you work with FF&E contractors?
Yes. We work with companies buying a project furniture package against an FF&E schedule, drawings or product list, with orders shipped in full containers.
What should the contractor send first?
Send the schedule, quantities, destination, drawings for custom items, material and finish references, project requirements and approval responsibilities.
Can our client approve finishes separately from drawings?
Identify what each approval covers and keep both decisions attached to the same item code and accepted revision.
Who inspects the finished furniture?
Our FBM Sourcing QC team performs one inspection after bulk production is complete and before shipment, with photos and video. Your own project team is welcome to attend the inspection with us.
How do the two charging arrangements work?
For suppliers you nominate, we charge a 5% commission; for products we source for you, we quote a direct price.
To get a quotation, send us
- An FF&E schedule or product list, room by room, with quantities — plus drawings for any custom pieces
- The specification or a reference photo or link for each item: dimensions, materials, fabric and finish
- Your fabric and finish selections, or ask us to propose them; tell us if fabric is supplied by you (COM)
- Where your project is, so we check the standards your market requires
- Whether your site needs flat-pack or assembled furniture, and how your site team wants cartons labelled
What the quotation shows. Per line: item, specification, materials, fabric and finish, dimensions, unit price, quantity, packing and lead time — like-for-like against your spec, any substitution flagged.
Where to look next
A repeat account with a construction company: reception furniture, seating, desks and storage from several specialist factories, inspected when production was finished and loaded into 3 x 40HQ containers.
The standards our main markets ask contract furniture to meet, and the evidence to request from any supplier.
Have an FF&E schedule to price?
Send the schedule and our team will price it line by line, against the standards your project has to meet.